After Months of Agony, Work Finally Begins
After a prolonged and frustrating wait for residents and daily commuters, repair work has finally commenced on the heavily damaged road stretch near Harshan Enclave in Belagavi.
The stretch had become a major concern due to deep potholes, uneven surfaces, and repeated complaints from citizens. For months, locals alleged that cantonment authorities had turned a blind eye to their grievances despite repeated appeals and visible deterioration of the road.
Now, following sustained public outcry and media attention, the much-needed repair work has officially begun.
Cantonment Authorities Step In
The repair work has been taken up by contractor Anil Godse. Machinery was deployed on Monday, marking the first visible action on the problematic stretch in several months.
Residents expressed cautious relief, stating that while the repairs are welcome, the delay had already caused significant inconvenience to schoolchildren, office-goers, and emergency vehicles navigating the stretch.
The development is being seen as a direct response to mounting pressure from citizens demanding safer roads within the cantonment limits.
Also Read: Belagavi Police Crack Down on Vehicles Without Number Plates; 126 Booked
What About Shourya Circle to St. Xavier’s School Circle?
However, uncertainty continues over another severely damaged stretch – between Shourya Circle and Yande Khoot, commonly known as St. Xavier’s High School Circle.
Speaking to Belgaum Mirror, contractor Anil Godse remained non committal regarding repair plans for this section.
Meanwhile, the Cantonment Executive Engineer stated that the stretch was “not currently under consideration” for full-scale repairs. However, he added that he would discuss the matter with the CEO and ensure that major potholes are addressed to provide at least temporary relief.
For daily commuters and parents dropping children at the St. Xavier’s High School, this statement offers only partial reassurance.
Local Context: A Repeated Pattern
Road infrastructure within Belagavi’s cantonment areas has frequently drawn criticism over delayed maintenance and patchwork repairs. The latest development underscores the power of citizen-driven accountability, but it also highlights the need for systematic, timely infrastructure planning rather than reactive measures.
Previously, Posters Pulled Down Overnight After Belgaum Mirror First Flags Ramghat Road Neglect
Residents are now watching closely to see whether the Shourya Circle – St. Xavier’s school stretch receives attention in the coming days.
For now, the repairs near Harshan Enclave offer relief – albeit delayed.





















