
Until Tuesday, the reservoir was just two feet short of its maximum capacity. However, continuous heavy rainfall from Tuesday night through Wednesday morning led to a significant inflow of water from the Tilari catchment, allowing the reservoir to fill completely within a short span of time.
Authorities have also begun routine maintenance and operational testing of the reservoir gates. As part of the inspection process, the gates are being opened by one to two inches to assess their functioning and ensure safe water management. Reporter Ramaling Patil (Tudiye), who visited the reservoir site, confirmed that the exercise is a standard maintenance procedure.
The Rakasakop Reservoir serves as the lifeline of Belagavi’s drinking water supply. With the reservoir now filled to capacity, uncertainty surrounding the city’s water availability has been effectively resolved. Residents can expect a regular and adequate supply of drinking water in the coming months.
Over the past several months, declining water levels had forced the administration to carefully regulate the city’s water distribution. The strong monsoon this season has significantly improved storage levels, providing much-needed relief to both authorities and citizens.
Meanwhile, the India Meteorological Department has forecast continued rainfall across the region over the next few days, raising the possibility of further inflows into the reservoir and sustained water security for Belagavi.





















